بيانات مشاريع الصندوق
اسم المشروع | Sary Bulak- Atbashe | حالة المشروع | قيد التنفيذ |
---|---|---|---|
الاقليم | دول وسـط آسـيا وأوروبـا | الدولة | قرغيزستان |
القطاع | النقل | القطاع الفرعي |
التفاصيل الفنية :
أهداف المشروع | The Project aims to meet the increasing demand for the transport of passengers and goods in the northern- southern corridor linking the capital city Bishkek with Torugart at the Border with Republic of China. The Project will also contribute to the economic and social development of the middle and southern regions of the country, reduce traveling time and vehicles operating cost |
---|---|
وصف المشروع | The Project involves the rehabilitation of Section II: Dolon Pass – Kyzyl-Bel Pass road of the Bishkek – Naryan – Torugart Corridor with a length of about 93 kilometers consisting of two lanes 3.5m wide each with 2x2m paved shoulders and institutional support for PIU and consultancy services for the detailed design and supervision of construction. |
التكلفة التقديرية | 85.00 مليون دولار |
التمويل :
الممولين الآخرين | |||
---|---|---|---|
تمويل الصندوق الكويتي | |||
النوع | قرض | الرقم | 832 |
القيمة | 4,410,000 دينار كويتي | تاريخ النفاذ | 10-05-2012 |
الجهة المنفذة :
الجهة | ministry of trasport and communication | البريد الالكتروني | n/a |
---|---|---|---|
العنوان 1 | 6 tazabek samanchin st. | رقم الفاكس | 996 312 54 25 78 |
العنوان 2 | bishkek 720020 | رقم التلفون | 996 312 56 98 76 |
الجهات الاستشارية :
الوضع الراهن | مسجلة |
---|
المقاولون :
الوضع الراهن | غير مسجلة |
---|
سير العمل :
التقدم الفني | جيد | ||
---|---|---|---|
التقدم المالي | 79.73% | ||
تاريخ الانتهاء المتوقع | 12-2020 | ||
تاريخ الادخال | 17-06-2009 | تاريخ التعديل | 05-09-2020 |