

بيانات مشاريع الصندوق
اسم المشروع | The Grand Tulum Aqueduct Project | حالة المشروع | قيد التنفيذ |
---|---|---|---|
الاقليم | دول أمريكا اللاتينية والبحر الكاريبي | الدولة | الأرجنتين |
القطاع | المــياة والصرف الصحى | القطاع الفرعي | - |
التفاصيل الفنية :
أهداف المشروع | The Project aims at meeting the current and future demand of safe drinking water, increase efficiency and reliability of the drinking water system, and contribute to improvement of general health and the environment in Great San Juan Area with current population of about 500,000 inhabitants and that by installation of a new drinking water system designed for a period of about 50 years and population exceed 750,000 inhabitants. |
---|---|
وصف المشروع | The proposed Project consists of installation of a new drinking water system that transport water from wells located about 25 KM west of the city of San Juan to complement the existing water system. The new system consists of drilling about 25 wells capacity of about 200 liters/second each with all ancillaries and laying Stainless Steel (SS) and High Density Polyethylene (HDPE) pipelines with special pieces. The Project also consists of consultancy services. |
التكلفة التقديرية | 127.60 مليون دولار |
التمويل :
الممولين الآخرين | |||
---|---|---|---|
تمويل الصندوق الكويتي | |||
النوع | قرض | الرقم | 911 |
القيمة | 15,000,000 دينار كويتي | تاريخ النفاذ | 02-03-2016 |
الجهة المنفذة :
الجهة | OSSE | البريد الالكتروني | 0 |
---|---|---|---|
العنوان 1 | Ignacio de la Roza O 272 San Juan, Pcia de San Juan CP (5400) | رقم الفاكس | 0 |
العنوان 2 | 0 | رقم التلفون | 5492644294111 |
الجهات الاستشارية :
الوضع الراهن | - |
---|
المقاولون :
الوضع الراهن | مسجلة |
---|
سير العمل :
التقدم الفني | متأخر | ||
---|---|---|---|
التقدم المالي | 36.43% | ||
تاريخ الانتهاء المتوقع | 12-2018 | ||
تاريخ الادخال | 09-03-2015 | تاريخ التعديل | 07-01-2021 |