Project Information
Project Name | Budhi Ganga Hydropower | Status | Active |
---|---|---|---|
Region | East, south asia & the pacific countries | Country | Nepal |
Sector | Energy | Sub Sector | Exchanges |
Technical Details:
Project Objectives | Construction of a concrete dam , 54 Meters Long and 25 Meters in Length. |
---|---|
Project Description | The project lies within the Archam and Bajora districts and is located approximately 830 km west of the capital Kathmandu. The project consists of construction of a concrete dam which has a surface upper level at 720 m above sea level and length of about 54 m and a non-overflow height of 25 m, and a concrete stilling basin that is 19 m wide and 80 m long. Power waterways consist of a 5.56 Km nominally unlined tunnel 5.1 m in diameter, a 7.5 m finished surge tank and a 219 m long, 3.5 meter drop shaft. The hydroelectric plant is a surface powerhouse with 20 MW capacity (two 10 MW Francis-type power generating units). The project includes a 132 kV switchyard and a 132 kV transmission line (88.6 km in length). The project includes the construction of access roads that are approximately 15 kilometers in length. |
Estimated Cost | 54.00 Million Dollars |
Financing :
Co Financiers | |||
---|---|---|---|
Kuwait Fund Financing | |||
Type | Loan | No. | 868 |
Amount | 5,000,000 KD | Effective Date | 01-05-2015 |
Implementing Agency :
Agency | Ministry of Finance | noemail@fund.com | |
---|---|---|---|
Address 1 | Ministry of Finance Kathmandu | Fax No | 0097714259769 |
Address 2 | Federal Democratic Republic of Nepal | Telephone No | 0097714259769 |
Consultant/s:
Status | Not Appointed |
---|
Contractor/s:
Status | Not Appointed |
---|
Progress:
Technical Progress | Fair | ||
---|---|---|---|
Financial Progress | 8.45% | ||
Expected Completion Date | 12-2017 | ||
Created | 24-04-2012 | Updated | 05-09-2023 |