Project Objectives | The first proposed project is to rehabilitate the Chashmassur-Lungar road with a length of about 8.5 km, consisting of two lanes with a width of 8 meters, with shoulders with a width of about 1.75 meters on each side, and the works include the reconstruction of water channels and a bridge with a length of about 36 meters. The second project proposed for the rehabilitation of the Togarak-Sarishashma road with a length of about 25 km, consists of two lanes with a width of 7 meters, with shoulders with a width of about 2.5 meters on each side, and the works include the reconstruction of water channels and the number of 3 bridges and the construction of a new bridge, with a total length of about 60 meters, and the implementation of water drainage supplies and facilities for the protection of side inclinations, and the supply and installation of traffic safety requirements for the two projects. |
Project Description | The first project consists of the rehabilitation of the Chashmasur-Lungar road with a length of about 8.5 km, consisting of two lanes with a width of 8 meters, with shoulders with a width of about 1.75 meters on each side, and the works include the reconstruction of water channels and a bridge with a length of about 36 meters. The second project also consists of the rehabilitation of the Togarak-Sarishashma road with a length of about 25 km, consisting of two lanes with a width of 7 meters, with shoulders with a width of about 2.5 meters on each side, and the works include the reconstruction of water channels and the number of 3 bridges and the construction of a new bridge, with a total length of about 60 meters, and the implementation of water drainage supplies and facilities for the protection of side tendencies, and the supply and installation of traffic safety supplies for the two projects. |