

Geographical And Sectorial Distribution Of Loans Up To 22-09-2023
Note: All Amounts are in Kuwaiti Dinar (Millions) (1 KD = US$3.40)
Sector | Sr. No. | Project Name | Loan Amount | Date of Agreement | Interest Rate | Loan Period (Years) | Grace Period (Years) | Grant Element |
---|---|---|---|---|---|---|---|---|
Energy | 1 | CONSTRUCTION OF 34 SMALL HYDROPOWER PLANTS | 8.800 | 22-04-2016 | 3.00% | 26.08 | 12.08 | 57.12% |
Total | 1 | 8.800 | ||||||
Water and Sewage | 1 | SANTIAGO DE CUBA WATER SUPPLY SYSTEM REHABILITATION | 3.079 | 24-07-2003 | 2.50% | 20.83 | 4.83 | 50.17% |
Water and Sewage | 2 | HOLGUIN WATER SUPPLY SYSTEM REHABILITATION | 4.400 | 20-11-2009 | 2.50% | 21.50 | 6.50 | 52.97% |
Water and Sewage | 3 | REHABILITATION OF WATER NETWORK AND SEWERAGE IN HAVANA | 7.500 | 30-04-2012 | 2.50% | 24.08 | 8.08 | 56.62% |
Water and Sewage | 4 | REHABILITATION OF WATER NETWORK AND SEWERAGE (SECOND LOAN) | 7.500 | 23-03-2015 | 2.50% | 21.00 | 5.00 | 50.55% |
Water and Sewage | 5 | REHABILITATION OF DRINKING WATER,SEWAGE AND STORM WATER DRAINAGE SYSTEM IN EASTERN HAVANA SEC STAGE | 8.500 | 22-03-2021 | 2.50% | 21.67 | 5.67 | 52.02% |
Total | 5 | 30.979 | ||||||
Grand Total | 6 | 39.779 | ||||||